What is RASCI?
RASCI is an acronym for five roles someone can have in a task:
- R, Responsible: the person who carries out the work.
- A, Accountable: the person with final responsibility, who signs it off.
- S, Supportive: whoever supports the execution.
- C, Consulted: whoever has to be consulted before the task is finished.
- I, Informed: whoever is informed about the result.
The model comes from the American technique of responsibility charting and is a tool in process management. In a matrix you put the tasks or process steps in the rows and the functions or people in the columns. Each cell holds a letter, or nothing. That way you see at a glance who is answerable for what in a process.
That sounds simple, and it is. The difficulty lies in filling it in. These eight tips help you create a matrix that is right.
Six tips on filling it in
- Every task has at least one R. No responsible person means the work does not get done. This is the first check you do once the matrix is finished.
- But not too many R's. With three or four people responsible, the work stays in the middle, because everyone thinks someone else will pick it up.
- Exactly one A per task. No more, no less. There is always one person or group with final responsibility. Sometimes that is the same as the R, often it is someone else.
- Count the R's and A's per person. If one person has noticeably many, that is a sign of overload. Or of a structure in which everything runs through one person.
- Be critical of C's and I's. Every C and I makes the process slower, because someone has to be consulted or informed. For every letter, ask whether it is really needed.
- Many C's point to too little authority. If the R constantly has to consult others, he apparently lacks the information or the mandate to finish the work himself. See whether you can give him more.
Two tips on the matrix as a whole
- Is someone only ever S, C or I? Then look at why. Why does this person need to be informed or consulted so often, and does that achieve anything?
- The table does not have to be full. Some tasks are done by one person, without accountability to anyone. Empty cells are not a mistake but a choice. Take stock of how the work really fits together and be sparing with roles.
RACI or RASCI?
RACI and RASCI are almost the same. RACI lacks the S of Supportive. For smaller processes in which the responsible person can easily finish the work alone, you leave out the S. If, in a larger process, too much threatens to land on the R's plate, you include the supporting roles and work with RASCI.
Which model you choose is up to you, see tip 8. What matters is that the matrix reflects the work as it really runs, not that all the letters have been used.
Two pitfalls of the traditional RASCI model
However well you apply the tips, the classic RASCI matrix has two persistent flaws. If you do not solve them, you end up with a paper tiger: a document that comes out for the audit and otherwise sits in a drawer.
Pitfall 1: the matrix is read too rigidly
Teams interpret the matrix as a fence. "This is part of my tasks, that is not." "I am responsible for this, not for that." Silo thinking, distance and restriction are the result, while the model was meant to make collaboration clear.
A RASCI model should not be static. Processes change, people change roles, tasks shift. The matrix you make in a spreadsheet today will be out of date in six months. At least, if colleagues use it. And that brings us to the second pitfall.
Pitfall 2: the matrix becomes too big
RASCI matrices grow. They become wider, longer and fuller, until they no longer fit on a normal screen. A huge spreadsheet somewhere on a shared drive invites no one to look. A confusing table naturally leads to less use, and a matrix nobody understands is wasted effort.
How to keep the matrix alive
The solution to both pitfalls is the same: take the RASCI matrix out of the loose spreadsheet and put it where the process itself lives. A small matrix per process, instead of one matrix for the whole organisation. Whoever opens the process immediately sees who has which role. Whoever changes the process adjusts the roles in the same move.
In a quality management system (QMS), the division of roles therefore sits with the process description, under version control. In Scienta, the RASCI model is part of the Ultimate package; see the pricing. The matrix stays small, readable for everyone on the shop floor, and moves along when the process changes. That way RASCI becomes what it was meant to be: an agreement you use every day, not a table you fill in once.
Start small. Choose one process where there is regular confusion about who does what, make a matrix of at most ten lines for it and discuss it with the people involved. Once that matrix is right, you know how to make the next one.
See also: what is a line organisation, or see how processes are described in Scienta on the product page.